PROJECT GUIDE

Prepare a molasses dosing project before equipment selection

The right proposal starts with the feed process, addition point, production target, plant layout and available utilities.

METHOD SELECTION

Choose the addition point first

Formula requirements and the line process determine whether batch mixer dosing or conditioner-stage dosing is the better fit.

Inside the mixer

Use the NLYT-HQ for batch weighing, pneumatic delivery and direct spray across the material in a feed mixer.

At the conditioner

Use the NLYT-TC for controlled delivery coordinated with material flow at the conditioning stage.

Post-pellet coating

This is a separate process route. Evaluate product requirements, available space and coating equipment before selecting it.

SITE SURVEY

Information needed for selection

ProductionFeed type, hourly output, batch size or conditioner model, and normal production rhythm.
FormulaTarget molasses rate, water ratio if used, and molasses characteristics.
LayoutAvailable floor area, height, maintenance access, storage position and pipe route.
UtilitiesPower supply, compressed air, water, control signals and plant communication requirements.
DeliveryDestination country, required documents, packing needs and installation responsibility.
AcceptanceAgreed control sequence, functional checks and project-specific performance criteria.

COMPANY PRESENTATION MODEL

Documented payback example

Nanling's molasses application presentation uses a theoretical project model: RMB 20 saving per tonne of feed and RMB 300,000 total project investment. It is not a verified customer result or a current quotation.

Where the saving comes from

The presentation treats cane molasses as about 70% of the energy value of corn. At a 2% inclusion it cites dust-rate improvement of 5.7% and palatability improvement of 8–12%, and states that molasses use can reduce production cost by at least RMB 10–20 per tonne.

How the period is calculated

Payback months = project investment ÷ (monthly feed output × saving per tonne). The 3-month result at 5,000 tonnes/month uses the high end of that saving range and a RMB 300,000 whole-project investment, not a single equipment list price.

What still has to be local

Actual payback depends on local corn and molasses prices, the approved formula, utilities, maintenance, installation scope and destination. Replace the model values with the plant's own numbers before using it in a purchase discussion.

Feed-plant molasses payback periods from the Nanling presentation, at RMB 20 / tonne and RMB 300,000 project investment
Monthly feed output3,000 t5,000 t8,000 t10,000 t20,000 t
Illustrative payback5 months3 months2 months1.5 months3 weeks
COMPANY PRESENTATION EXAMPLE · THEORETICAL ASSUMPTIONS · NOT A CUSTOMER RESULT OR CURRENT QUOTE
Illustrative payback3.0 months

Monthly saving in this model: RMB 100,000. Replace the values with local output, ingredient economics and project cost. The estimate excludes utilities, financing, maintenance and formulation differences.

DELIVERY PROCESS

From review to installation

Typical manufacturing, testing and service periods are references; the project quotation confirms the final schedule.

Application review

Feed type, output, addition point, target rate, utilities and available space are reviewed before selection.

Configuration and drawings

The equipment arrangement, interfaces, electrical supply and project responsibilities are confirmed before manufacture.

Manufacturing

A typical reference period is 30-45 working days after the deposit and approved technical documents.

Factory acceptance

Visual, piping, electrical, control, alarm, instrument and no-load function checks can be witnessed on site or by live video.

Packing and shipment

Export packing is prepared after acceptance and final payment. Freight, customs and destination delivery are confirmed per project.

Installation and support

Nanling can provide English documentation, remote guidance or overseas commissioning and operator training.

SUPPORT

Documents and service for overseas projects

Scope is agreed before order confirmation.

English documentation

Project drawings, operation guidance and agreed technical documents can be supplied in English.

Factory acceptance

Control sequence, alarms and agreed functions are checked before shipment; remote participation can be arranged.

Installation support

Remote guidance or overseas on-site service can be included according to the project and destination.

Warranty

Reference warranty: 12 months from arrival or 15 months from ex-factory date, whichever occurs first, subject to the contract.

Spare parts

A recommended spare-parts list can be prepared according to the selected configuration.

Remote support

Nanling provides remote troubleshooting and operating support after commissioning.

APPLICATION REVIEW